When I was cleaning out my shop to make room for the lathe, which involved new tool chests, rearranging tools in the tool chests, and reorganizing all the drawers in the garage shop, I purged a lot of hardware that has been traveling with me for a decade or more. I actually had a box of cobbler tacks, among various other small lots of stray nails, screws, and old cabinet hinges, etc.
I threw away the old iron that didn't work but I was going to fix someday in order to wax my skis--the same skis that are now the bottom half of a sled for my kids and probably won't need wax. Gone is my collection of circular saw blades that came off the saw because they were dull, but are resharpen-able (for about twice the cost of a new blade). No more is my galvanized steel bucket full of pole barn nails, salvaged from a chicken-coop/shed in the back yard of a house I lived in 15 years ago. My buddies and I had a grand time burning down that shed along with the original outhouse one thirsty autumn afternoon. The knee pads with a broken strap that I paid $5 for at the China Depot--gone. The glue-encrusted rubber gloves, grimy dust mask, welding goggles, dog leash, and cut-off ends of several baseball bats--mere memories. I could not bring myself to discard the winter gloves that I have had since 1984, though; they are still reasonably intact and fit, so I put them under the seat of my truck for emergency use.
When I came across the Quick grip hold down clamps, I had a dilemma: I never have enough clamps, and here were two that I have been moving around for many years, never having been used because they are meant to be installed in the top of a workbench and have only one side--the other end being the work top surface. They require a hole to be drilled the your work bench top and are fairly immovable once installed. Just never found a good home for them. But how could I throw out a pair of clamps? The solution: I welded them together. Already they have proven to be useful in a variety of situations that I could not have envisioned. I wonder what other stuff I threw out that I could have found a use for eventually? Dammit.
“A human being should be able to change a diaper, plan an invasion, butcher a hog, conn a ship, design a building, write a sonnet, balance accounts, build a wall, set a bone, comfort the dying, take orders, give orders, cooperate, act alone, solve equations, analyze a new problem, pitch manure, program a computer, cook a tasty meal, fight efficiently, die gallantly. Specialization is for insects." Robert Anson Heinlein
Monday, June 7, 2010
Yoda, at Last
Saturday was sucked up by the hitch adapter, mowing the lawn, and the heat/humidity being just ridiculous. But Sunday was a beautiful day to spend in the garage-shop and Yoda beckoned. I got consensus from the family that we would think about God while we proceeded with our day instead of spending a couple hours visiting with his flock. So I got an early start, read the paper, had some breakfast with the family, sent a letter to congress [read: shat], and was hard at "work" before 9AM. What a great start.
I had already glued the two mahogany blanks into one piece for the back, so I was ready to cut the back into the dreadnought shape and inlay the back strip. I had also previously made an MDF template from the original damaged back, so it was simply a matter of setting up a piloted flush cut bit in the router table, double stick taping the template to the new back, and routing it out. Just to be safe, I ran a test piece from a leftover cabinet back panel and it worked perfectly. I was a little concerned because I had cut the template free hand with a jig saw then sanded it down to shape with a drum sander in the drill press. This actually yielded a good result, but there were very slight variations in the surface that I was concerned would telegraph into the finished piece. Fortunately, this did not happen on the test piece, so I went ahead and cut the actual back.
Next, I used a jig that I had previously made to guide the router for cutting dadoes to set up the back strip inlay. I had also used this jig as a clamping cawl when I glued the back blanks together. The back strip was 11/64" wide and all I had that small was an 1/8" bit, so I would have to make the groove in two passes. I set up the groove to be 1/16" deep, as the back was roughly 1/8" thick. Although this operation was rife with opportunities to ruin the most expensive part of this endeavor, amazingly, it went smoothly. I taped off either side of the groove so that I didn't get glue on the adjacent back which would cause it to not accept stain, and then glued in the back strip. Of course the back strip was about 1/16" proud of the back, so I planed it down to about 1/32 to sand down the rest of the way. And of course, I managed to take a gouge out of the back with the plane. And there you go. The last time I ground the plane iron with my half-assed grinder, I managed to get the iron bevel skewed so that it is no longer straight and cannot be made parallel to the sole. Building a better tool grinder will undoubtedly be my next distraction. I was able to fill the gouge and this will require some delicate sanding, but it is not unfix-able--just irritating.
The next step was to glue the bracing to the inside of the back. I had salvaged the bracing from the original, so the arch would be formed by the arch carved into the original braces. This did present a glue-up puzzle, though. I am sometimes asked by well-wishers what I would like as a gift for a birthday, or Christmas, or Father's day. I always reply that I wish for nothing. But when pressed, I usually say "clamps". I just never seem to have enough clamps. You can see from the picture that I had to improvise with various cawls to try to get uniform clamping pressure across the braces in order to form the arch into the back. But in the end, it worked out OK.
While the glue was setting on the back, I worked on the fretboard and head stock. I had filled all the dings and divots in the fretboard and neck and had everything pretty much sanded down. The wood filler I am using is a little pink and it looked really pink against the rosewood fretboard, but I'm hoping it will stain OK.
I cut a piece of cherry veneer from some scrap and planed it down to 1/8". With it double stick taped to the headstock, I routed it to shape, then drilled, reamed to 1 degree taper, and lapped the tuner holes. This was probably overkill, but they are nice looking holes (and what else would I do with a 1 degree reamer and a box of lapping tools). In order to rout the access hole for the truss rod accurately, I clamped the headstock into the mill vise using tapered maple blocks that I made last week for my bench vise in order to clamp the neck for sanding. This worked out reasonably well and I was able to have good control of the cut with the mill. This will be covered by the original tortoise shell plastic plate, but the hole still had to look precise in case anybody ever adjusted the rod and got a look at the hole. The cherry is going to stain up and look very nice, though oddly similar to the original paper veneer that I had removed. I might end up doing an inlay or something to set it apart. We'll see how the rest of the project goes.
The back turned out pretty nice, though its a shame about the gouge. It won't be detectable, but I hate that it happened. That hand plane has always bothered me--I really need to get the iron straightened out and get more comfortable with it. You can see in the picture where I still have some more sanding to do. Dammit. Shame on me for using a hand tool. I am very pleased with the grain pattern that we lucked into. Its almost a shame to put such a nice piece of wood on such an ill-fated instrument. Oh well, luck of the draw.
Preparing to install the top next weekend, I cleaned up all the machine tuners and the pickup for re-installation. They cleaned up well enough, but still pretty dinged up. I soldered a new input jack to the pickup and then installed them, only to find that the jack was not deep enough to fit through the repaired hole. I had installed a thin veneer piece to the inside of the blown out hole and the made a nice round plate for the exterior side in order to reinforce the area against the trauma of plugging/unplugging. The threaded end of the jack is not long enough to extend through even the original wood, let alone the two additional pieces. So I guess a trip to Radio Shack is in my future. Sadly, my local Shack is in a strip center next to a restaurant that apparently barbecues road kill in a secret fermented horse urine sauce. At least that's what it smells like. But I just can't justify a trip to Mendelson's for a simple $2 item. Maybe the hardware store will have one.....
Anyhow, next week, I should be installing the back and working on installing frets and maybe setting the neck. It's getting closer.
Next, I used a jig that I had previously made to guide the router for cutting dadoes to set up the back strip inlay. I had also used this jig as a clamping cawl when I glued the back blanks together. The back strip was 11/64" wide and all I had that small was an 1/8" bit, so I would have to make the groove in two passes. I set up the groove to be 1/16" deep, as the back was roughly 1/8" thick. Although this operation was rife with opportunities to ruin the most expensive part of this endeavor, amazingly, it went smoothly. I taped off either side of the groove so that I didn't get glue on the adjacent back which would cause it to not accept stain, and then glued in the back strip. Of course the back strip was about 1/16" proud of the back, so I planed it down to about 1/32 to sand down the rest of the way. And of course, I managed to take a gouge out of the back with the plane. And there you go. The last time I ground the plane iron with my half-assed grinder, I managed to get the iron bevel skewed so that it is no longer straight and cannot be made parallel to the sole. Building a better tool grinder will undoubtedly be my next distraction. I was able to fill the gouge and this will require some delicate sanding, but it is not unfix-able--just irritating.
The next step was to glue the bracing to the inside of the back. I had salvaged the bracing from the original, so the arch would be formed by the arch carved into the original braces. This did present a glue-up puzzle, though. I am sometimes asked by well-wishers what I would like as a gift for a birthday, or Christmas, or Father's day. I always reply that I wish for nothing. But when pressed, I usually say "clamps". I just never seem to have enough clamps. You can see from the picture that I had to improvise with various cawls to try to get uniform clamping pressure across the braces in order to form the arch into the back. But in the end, it worked out OK.
I cut a piece of cherry veneer from some scrap and planed it down to 1/8". With it double stick taped to the headstock, I routed it to shape, then drilled, reamed to 1 degree taper, and lapped the tuner holes. This was probably overkill, but they are nice looking holes (and what else would I do with a 1 degree reamer and a box of lapping tools). In order to rout the access hole for the truss rod accurately, I clamped the headstock into the mill vise using tapered maple blocks that I made last week for my bench vise in order to clamp the neck for sanding. This worked out reasonably well and I was able to have good control of the cut with the mill. This will be covered by the original tortoise shell plastic plate, but the hole still had to look precise in case anybody ever adjusted the rod and got a look at the hole. The cherry is going to stain up and look very nice, though oddly similar to the original paper veneer that I had removed. I might end up doing an inlay or something to set it apart. We'll see how the rest of the project goes.The back turned out pretty nice, though its a shame about the gouge. It won't be detectable, but I hate that it happened. That hand plane has always bothered me--I really need to get the iron straightened out and get more comfortable with it. You can see in the picture where I still have some more sanding to do. Dammit. Shame on me for using a hand tool. I am very pleased with the grain pattern that we lucked into. Its almost a shame to put such a nice piece of wood on such an ill-fated instrument. Oh well, luck of the draw.
Preparing to install the top next weekend, I cleaned up all the machine tuners and the pickup for re-installation. They cleaned up well enough, but still pretty dinged up. I soldered a new input jack to the pickup and then installed them, only to find that the jack was not deep enough to fit through the repaired hole. I had installed a thin veneer piece to the inside of the blown out hole and the made a nice round plate for the exterior side in order to reinforce the area against the trauma of plugging/unplugging. The threaded end of the jack is not long enough to extend through even the original wood, let alone the two additional pieces. So I guess a trip to Radio Shack is in my future. Sadly, my local Shack is in a strip center next to a restaurant that apparently barbecues road kill in a secret fermented horse urine sauce. At least that's what it smells like. But I just can't justify a trip to Mendelson's for a simple $2 item. Maybe the hardware store will have one.....Anyhow, next week, I should be installing the back and working on installing frets and maybe setting the neck. It's getting closer.
Dirtbike Carrier Unit Adapter
Although I was eager to get to work on Yoda, I had a chore to do first this weekend. I have made a verbal agreement to sell my dirtbike with the Carrier Rack Unit I made last spring; but, the guy has a woosy hitch--1-1/4" receiver instead of the standard 2" that the unit was designed for. So I spent Saturday morning at the scrap yard and found a 3" round tube and a 1-1/4" solid steel bar to make an adapter. This set up will actually work better than my original design, with the tube fitting inside the tube on the CRU instead of the square tube extender I use with with the larger receiver.
Thursday, June 3, 2010
Its Alive!
Who doesn't love a 3 day weekend, even when you have house guests. If you ignore them, you can get a lot accomplished. With the wife and kids running interference, I was able to sequester myself in the garage-shop several hours at a time, and Voila!, I solved the mystery of the government [read: non-working] lathe.
Because the mill was working, I believed that the switch configuration was correct. So I had 3 phase power going at least to the end of the wires at the lathe. My concern was that there were only 3 wires coming from the motor and one of them was green, suggesting single phase 220V with a ground. But the motor plate clearly said 3 phase. Further obfuscating things was the directional switch--reverse-off-forward--that was wired in the connection box to the motor with all black wire. But when I took the cover off the switch, I could see clearly that it was a 3 pole switch, which made the connections somewhat irrelevant except in making the reverse position actually run the motor in reverse and vice-versa, but this was only a matter of rearranging the wires after I got the lathe running, if necessary. My next step was to look at the wiring at the motor.
While removing the side access panel, I admired the craftsmanship that went into building the machine, down to the point of tapping the housing for the machine screws that hold the access panel in place instead of using nut and bolt. With the panel removed and a good light, I was able to get a better look at the motor plate, which offered the critical clue as to why the motor was not running. This is a dual voltage motor--208/220--460V. It dawned on me that the school from which the lathe came was probably set up for 460V, so the motor was probably wired for that configuration. All that remained was to rewire the motor for 220V (220--221, whatever it takes).
When I removed the wire access panel on the motor, I was relieved to find the wiring diagram printed on the inside for both voltages and all the brass wire identification tags were still intact on the wire leads, so it was simply connect the dots. Once I had the motor re-wired, I fired it up and it ran perfectly. My variable drive does work for adjusting the spindle speed, except that at too low RPM, the spindle won't turn at all.
I was a little concerned that there was no ground wire, but I bonded the case to the metal conduit I have run continuously back to the sub panel, so short of running a separate conductor (which is over kill and would be a PITA), that will have to be sufficient. But all in all, the system works as intended and I was up and running early Saturday, leaving some time to get back to work on Yoda.
Because the mill was working, I believed that the switch configuration was correct. So I had 3 phase power going at least to the end of the wires at the lathe. My concern was that there were only 3 wires coming from the motor and one of them was green, suggesting single phase 220V with a ground. But the motor plate clearly said 3 phase. Further obfuscating things was the directional switch--reverse-off-forward--that was wired in the connection box to the motor with all black wire. But when I took the cover off the switch, I could see clearly that it was a 3 pole switch, which made the connections somewhat irrelevant except in making the reverse position actually run the motor in reverse and vice-versa, but this was only a matter of rearranging the wires after I got the lathe running, if necessary. My next step was to look at the wiring at the motor.
While removing the side access panel, I admired the craftsmanship that went into building the machine, down to the point of tapping the housing for the machine screws that hold the access panel in place instead of using nut and bolt. With the panel removed and a good light, I was able to get a better look at the motor plate, which offered the critical clue as to why the motor was not running. This is a dual voltage motor--208/220--460V. It dawned on me that the school from which the lathe came was probably set up for 460V, so the motor was probably wired for that configuration. All that remained was to rewire the motor for 220V (220--221, whatever it takes). When I removed the wire access panel on the motor, I was relieved to find the wiring diagram printed on the inside for both voltages and all the brass wire identification tags were still intact on the wire leads, so it was simply connect the dots. Once I had the motor re-wired, I fired it up and it ran perfectly. My variable drive does work for adjusting the spindle speed, except that at too low RPM, the spindle won't turn at all.
I was a little concerned that there was no ground wire, but I bonded the case to the metal conduit I have run continuously back to the sub panel, so short of running a separate conductor (which is over kill and would be a PITA), that will have to be sufficient. But all in all, the system works as intended and I was up and running early Saturday, leaving some time to get back to work on Yoda.Monday, May 24, 2010
Completed Switch
I went back to Mendelson's early Saturday morning, sheepishly, hoping to get in and out of there without encountering my new nemesis "Big Elf". My goal was to acquire another switch in order to disassemble it and use the cam I needed to make my original switch work. Simple. But while I was there, I decided that I would add 2 pilot lights to indicate which circuit was active--the Mill or the Lathe. Naturally, there was no complete light to be found, so I had to Frankenstein some stuff together. This necessitated an hour of sorting through racks of random parts looking for the combination of size, voltage, lamp, and lens that would work together. I did manage to assemble 2 lights for $2.50 each, so it was worth it. The switch I needed was right were I had left it--with 3 other switches. I was tempted to buy them all, but I have enough "maybe I'll need this some day" and realizing that the budget has been blown on this switch many times over, I opted out.
I did note that the other switches were 3 position instead of the 5 position I was using, so this was a bonus--I planned to use the 3 position switch head from the new switch with the circuit modules from the switch I had at home. I proceeded to the check out pile...and there he was. It was like he was lying in wait for me. "Big Elf" wasted no time in snarking to me "I guess the price wasn't so bad after all." Resisting the urge to purge, I simply replied that I needed this one to make the other one work. We completed our transaction and I was off.
I had decided to fill some of the holes in the motor starter box that I was re-purposing for the switch. I had picked up a can of Bondo earlier in the week. Never having worked with the stuff personally, I decided to start there so that I could get the box repaired and repainted with some dry time while I was building the switch. The smell of Bondo was instantly familiar, though I'm not sure why--Dad was not a big fan of the stuff. Remembering that I had hated that smell, it was strangely comforting now--something akin to "your own shit don't stink". It took a few tries for me to get the holes filled to my satisfaction. Finally deciding that I was taking too much time with this, I put a coat of paint on and set it aside to dry while I worked on the switch.
Once I got the switch apart, I realized that the cams in the two switches were not the same and I would not be able to simply take a cam from the new and add it to the old to get the "dead" position I needed. Moreover, the 3 position head and the 5 position head worked in tandem with their respective cam designs, so it at first looked like I was not going to be able to get a working combination. Ultimately, I found that the head and 2 cams from the new switch installed on the circuits of the old switch gave me everything I needed except...one cam. So I was back where I started except that I now had a 3 position switch head and would not have to manually bi-pass 2 "dead" positions. Looking at the cams I had leftover, I realized that I had 2 cams with only 1 detente and I needed 1 cam with 2 detentes. So I had 2 tries to make the cam I needed.
This would, of course, be a perfect job for the Mill. I felt that temporarily wiring up the VFD and the Mill to do this job was a bit excessive (you have to draw the line somewhere), so I resorted to caveman technology, sort of. I fitted the cam I needed to copy to the cam I was cutting together as they normally mate and chucked the unit into my vise. These are nylon cams, so cutting the material could be achieved in a variety of ways. I chose a copping saw. I was able to rest the blade against the pattern cam and follow its profile as I cut the new cam. It worked reasonably well, leaving only a little fine tuning to be done with the Dremel tool (actually a China Depot knock-off of a Dremel tool--when will I learn) with an engraving bit. My first attempt worked, so I have a spare if I need it.
I got the switch all together and it worked well, so I was ready to assemble the box. Looking at the now dry box, I decided that it needed another coat of paint. Naturally, this resulted in a mess. For some reason, the fresh paint crackled slightly. I had been very careful to keep contaminates away from the box as it dried and even wiped it with mineral spirits before I painted...oops. I guess the mineral spirits prevented adhesion. So I had to wait for it to dry, sand it down again, and start over. Meanwhile, I went ahead and pulled wire in the conduit I had run last weekend. And this meant that I would soon discover that I had not bought enough wire, so a trip to Lowes. By the time I got back, the paint was dry, so I sanded it again and repainted it again. The finish was not what I had hoped for, but it was good enough. I pulled the wire and then while I waited for the paint to dry, started rearranging tools from the old tool chest to the new tool chest that I bought at the garage sale from the old retired machinist from whom I also bought some tooling --did I mention that? Anyway, I will end up with a tool chest for machining and a tool chest for my general tools.
When the paint was dry a third (or fourth, I lost track) time, I assembled the switch and the pilot lights and wired it up. It went together pretty easily (that may not be accurate since this is day 5 on this thing). I did have to change a dedicated ground to a common in order to make the pilot lights work appropriately, so I am using a shared ground for the Mill, Lathe, and Compressor. Not sure if this is Code Kosher, but it works for now (I'll read up on that later). The switch worked fantastically and the Mill is back in business. The Lathe, on the other hand, did not work. I'm certain that the circuit from the switch is correct, since the Mill works. The wiring on the Lathe is highly suspect and the motor might be bad. If I have to buy another motor, I could just buy single phase and this whole switch thing will have been for naught. I didn't have time to figure out the problem, so that will be next week's adventure.
I did note that the other switches were 3 position instead of the 5 position I was using, so this was a bonus--I planned to use the 3 position switch head from the new switch with the circuit modules from the switch I had at home. I proceeded to the check out pile...and there he was. It was like he was lying in wait for me. "Big Elf" wasted no time in snarking to me "I guess the price wasn't so bad after all." Resisting the urge to purge, I simply replied that I needed this one to make the other one work. We completed our transaction and I was off.
I had decided to fill some of the holes in the motor starter box that I was re-purposing for the switch. I had picked up a can of Bondo earlier in the week. Never having worked with the stuff personally, I decided to start there so that I could get the box repaired and repainted with some dry time while I was building the switch. The smell of Bondo was instantly familiar, though I'm not sure why--Dad was not a big fan of the stuff. Remembering that I had hated that smell, it was strangely comforting now--something akin to "your own shit don't stink". It took a few tries for me to get the holes filled to my satisfaction. Finally deciding that I was taking too much time with this, I put a coat of paint on and set it aside to dry while I worked on the switch.
This would, of course, be a perfect job for the Mill. I felt that temporarily wiring up the VFD and the Mill to do this job was a bit excessive (you have to draw the line somewhere), so I resorted to caveman technology, sort of. I fitted the cam I needed to copy to the cam I was cutting together as they normally mate and chucked the unit into my vise. These are nylon cams, so cutting the material could be achieved in a variety of ways. I chose a copping saw. I was able to rest the blade against the pattern cam and follow its profile as I cut the new cam. It worked reasonably well, leaving only a little fine tuning to be done with the Dremel tool (actually a China Depot knock-off of a Dremel tool--when will I learn) with an engraving bit. My first attempt worked, so I have a spare if I need it.
I got the switch all together and it worked well, so I was ready to assemble the box. Looking at the now dry box, I decided that it needed another coat of paint. Naturally, this resulted in a mess. For some reason, the fresh paint crackled slightly. I had been very careful to keep contaminates away from the box as it dried and even wiped it with mineral spirits before I painted...oops. I guess the mineral spirits prevented adhesion. So I had to wait for it to dry, sand it down again, and start over. Meanwhile, I went ahead and pulled wire in the conduit I had run last weekend. And this meant that I would soon discover that I had not bought enough wire, so a trip to Lowes. By the time I got back, the paint was dry, so I sanded it again and repainted it again. The finish was not what I had hoped for, but it was good enough. I pulled the wire and then while I waited for the paint to dry, started rearranging tools from the old tool chest to the new tool chest that I bought at the garage sale from the old retired machinist from whom I also bought some tooling --did I mention that? Anyway, I will end up with a tool chest for machining and a tool chest for my general tools.
When the paint was dry a third (or fourth, I lost track) time, I assembled the switch and the pilot lights and wired it up. It went together pretty easily (that may not be accurate since this is day 5 on this thing). I did have to change a dedicated ground to a common in order to make the pilot lights work appropriately, so I am using a shared ground for the Mill, Lathe, and Compressor. Not sure if this is Code Kosher, but it works for now (I'll read up on that later). The switch worked fantastically and the Mill is back in business. The Lathe, on the other hand, did not work. I'm certain that the circuit from the switch is correct, since the Mill works. The wiring on the Lathe is highly suspect and the motor might be bad. If I have to buy another motor, I could just buy single phase and this whole switch thing will have been for naught. I didn't have time to figure out the problem, so that will be next week's adventure.
Wednesday, May 19, 2010
Switch Update
I got the distributor for the switch on the phone and he is going to try to scrounge up a cam for me. I asked him, out of curiosity, what a new switch would cost: $770.00.
I've decided that $15.00 maybe wasn't such a bad deal. I'm going back to Mendelson's to buy the other 4 that were on the shelf, new in the box. I'll be selling for $100.00 each, if anyone is interested.
I've decided that $15.00 maybe wasn't such a bad deal. I'm going back to Mendelson's to buy the other 4 that were on the shelf, new in the box. I'll be selling for $100.00 each, if anyone is interested.
Control Panel
This weekend I worked on the control panel for the mill and lathe. The challenge has been to find a 3 pole, 3 throw switch (tptt). Initially I was looking for a simple disconnect, but I had no luck finding such an animal, concluding that a selector switch was my only option. Not being too familiar with controls, it has been learning experience for sure. Most of the web sites I found offered catalog descriptions and were not helpful in describing applications. My other problem was a constant in all my little projects: limited willingness to part with money. This drove me to the very lair of the enemy: Mendelson's Surplus. I mention them by name now (formerly I refrained) because they managed to piss me off again. A surly attitude from one of the elves who apparently has been knighted within the organization--or whatever elves do to elevate their status--had me steaming as I left the building. I have sworn them off before and gone many years without darkening their door, but the gravitational pull is hard to resist; sometimes I can feel it tugging at me from my shop--like when I'm in a quandary about how to make something work without spending too much money on new parts, not knowing if they will serve my intentions. The issue this time relates to the outrageous pricing. After spending literally hours sorting through piles of junk that has sat in heaps for decades, I tried to get a price quote from the elf, who decided to do an online search to find the retail price.
I mentioned that I had bought a similar item from them last week for $7.50 (a switch that I disassembled and probably would have worked had I not lost patience trying to fit all the little springs and cams back together after locating them from the various corners of the shop where they ultimately landed after bouncing around like ricochets in a cowboy movie), and that I wasn't particularly interested in the retail price of this ancient switch. Having invested my own time in finding it, and realizing that I may be the only person the universe who could actually find a use for it and who was willing to look for it, I felt that about $10.00 was fair. Well, you would think that I had just insulted his mother. He mentioned that he didn't know what it was worth, but he was sure it was worth more than $10.00. I explained that it was only worth as much as someone was willing to pay for it, and that I was willing to pay $10.00. I asked if he would rather have $10.00, or a useless switch buried on a shelf for another decade. He replied that he would just put it back on the shelf "because I can". I resisted the urge to just walk away (as a younger man, I would have let loose a verbal assault intent on making him cry, but I've grown...), because I really needed the switch in order to keep working over the weekend. We settled on $15.00. I mentioned that I had been a customer since the 1980s and had never been treated so poorly. I'm not sure what he said to my back as I was walking away.
So, I got home with the switch and immediately took it apart. This is a nice big switch, so the springs and cams are a manageable size. I gave myself a pretty good headache trying to work out the functions to do what I needed, and re-assembled and dis-assembled the switch a few times before I got it to where I think it will work. It is not ideal--I have a dead position that powers one line and I need a specific cam to open the pole. If I bought another switch, I would have the cam I need, but I don't want to spend another $20 and I don't want to go back to Mendelson's.
I found the manufacturer and a distributor in New Jersey. Turns out, these switches are made for marine shore power and generator switching, which is essentially the function I need. I can probably buy a new switch that does exactly what I need, but I'm guessing that a new switch like this is a $100 item. I did send an e-mail to the distributer inquiring if I could acquire just the cam I need. Waiting on a reply.
So, I got home with the switch and immediately took it apart. This is a nice big switch, so the springs and cams are a manageable size. I gave myself a pretty good headache trying to work out the functions to do what I needed, and re-assembled and dis-assembled the switch a few times before I got it to where I think it will work. It is not ideal--I have a dead position that powers one line and I need a specific cam to open the pole. If I bought another switch, I would have the cam I need, but I don't want to spend another $20 and I don't want to go back to Mendelson's.
I found the manufacturer and a distributor in New Jersey. Turns out, these switches are made for marine shore power and generator switching, which is essentially the function I need. I can probably buy a new switch that does exactly what I need, but I'm guessing that a new switch like this is a $100 item. I did send an e-mail to the distributer inquiring if I could acquire just the cam I need. Waiting on a reply.
Thursday, May 13, 2010
Driving Instructions, Part I
Ok, here is lesson one of an infinite series of specific driving tips and techniques for the average driver [read: moron]. The illustration applies not only to making right hand turns, but also to parking on a curve. The object of this lesson is to learn how not to "curb" your vehicle, and more importantly, how not to ruin someone else's lawn.
It is apparently a little known fact that a wet lawn, as they often are in the spring of the year, is soft. A typical vehicle weighs in the neighborhood of 4,000 pounds. All of that weight is resting on 4 wheels with a contact area in the neighborhood of 133 square inches (trust me, I researched this); thus, a point load of 30 pounds per square inch. Typical soil bearing capacity when dry is 2,000 pounds per square foot, or 14 pounds per square inch. This is significantly reduced when soils are wet, but soils do vary greatly, so they could have more capacity To be conservative, we'll just use 14 psi. You can see that a car exerts nearly double the load of the soil's bearing capacity. The end result is a rut. In someone's lawn.
Although some people don't care about their lawn, it is safe to assume that many people do. And, those people would prefer that a car stay off of the lawn so that said ruts do not appear. There are many reasons that ruts in a lawn are undesirable, but for this discussion, we'll just take it as a given.
If the illustration seems confusing, take a minute to examine the one viable route. The logical conclusion is that the nose of the car needs to progress further in a straight line before the turn is initiated to ensure that the rear wheels follow on the pavement and not over the adjacent lawn or curb.
This may take some practice, but once ingrained into your driving habits, it's no trouble at all. Besides, think of how otherwise inconvenient it would be to have to get a new windshield when some angry homeowner comes storming out of his garage with a baseball bat and starts beating on your car and shouting obscenities about how you ruined his lawn.
It is apparently a little known fact that a wet lawn, as they often are in the spring of the year, is soft. A typical vehicle weighs in the neighborhood of 4,000 pounds. All of that weight is resting on 4 wheels with a contact area in the neighborhood of 133 square inches (trust me, I researched this); thus, a point load of 30 pounds per square inch. Typical soil bearing capacity when dry is 2,000 pounds per square foot, or 14 pounds per square inch. This is significantly reduced when soils are wet, but soils do vary greatly, so they could have more capacity To be conservative, we'll just use 14 psi. You can see that a car exerts nearly double the load of the soil's bearing capacity. The end result is a rut. In someone's lawn.
Although some people don't care about their lawn, it is safe to assume that many people do. And, those people would prefer that a car stay off of the lawn so that said ruts do not appear. There are many reasons that ruts in a lawn are undesirable, but for this discussion, we'll just take it as a given.
If the illustration seems confusing, take a minute to examine the one viable route. The logical conclusion is that the nose of the car needs to progress further in a straight line before the turn is initiated to ensure that the rear wheels follow on the pavement and not over the adjacent lawn or curb.
This may take some practice, but once ingrained into your driving habits, it's no trouble at all. Besides, think of how otherwise inconvenient it would be to have to get a new windshield when some angry homeowner comes storming out of his garage with a baseball bat and starts beating on your car and shouting obscenities about how you ruined his lawn.
Monday, May 10, 2010
Rearranging the Shop
I liberated the bench and cabinets that had been the home of various planting implements and lawn chemicals for my new workbench. Ultimately, this is going to work much better, as I can get the gardening stuff all together in the large mobile cabinet that already has fuels, chainsaws, shovels, and other unpleasantries. I built this cabinet to be somewhat fireproof, having made it from steel panels, unistrut, and fire rated doors left over from a construction project. I don't imagine my insurance agent would approve storing fertilizers and accelerants together, but having them at least in a semi-resistant cabinet is probably better than in most households.
I still need to add some shelving above the workbench, so I can add a work light below and have space to store projects in-process (because I tend to get side tracked, if you haven't noticed). The lamp I spent a bit of time working on (haven't posted anything on this yet), and put aside because I didn't like the way it was turning out, eventually needs to be finished; I am not ready to re-purpose the cherry wood, which I spent quite a bit of time milling down from rough lumber for which I traded a pretty nice Delta compound miter-saw. So, I have a pile of parts that need a temporary home and I suspect that even when the lamp is finished, there will always be something in que. Even Yoda needs a place to rest between my attacks.
Next on the agenda is to wire up the lathe, then get back to Yoda. I fab'd a bracket to mount to the wall and extend out 24" as a mounting post for the VFD and the disconnect for the mill and lathe. This will put the VFD in arms reach of both machines, which is much more handy than mounted flat on the wall next to the mill (where I had it originally). Reason being that I can use the VFD to control motor speed of both machines without messing with belts and gearing. You can see the bracket mounted in the first picture. But the VFD cannot run both machines simultaneously, so as a precaution, I have been searching for, and I think I have found, a 3 pole, 3 position switch, so I can select either machine with only one powered at any given time, but both powered from the VFD. I bought more wire and some AC conduit (and made it out of Lowes for under 50 bucks--Woohoo!) to make the connections and I am eager to get this done. But I ran out of time this weekend, so it will probably be next weekend before I get to it.
Thursday, April 29, 2010
Southbend Lathe
I went to a school auction yesterday and scored a Southbend metal lathe. I haven't had time to mess with it yet, or even research it, but it is a good size for my garage shop and what I've read on-line suggests that the old Southbend lathes are a good bet with parts generally available and heavy construction that lends to long life. Having been in a school, I'm sure it has been abused; the rails look pretty dinged up. But since I'm not going to be trying to make anything with close tolerance, it should be good for general purpose.
Obviously, it has a 3 phase motor. But since I am already using a variable frequency drive on my 3 phase vertical mill, I'm thinking I will be able to run the lathe off the same drive and not have to buy another one. I just wont be able to run them simultaneously. I'll probably wire in a disconnect so that its not possible to accidently have them both in the "on" position at the same time.
Moving this dude presented the same problems as with the Mill; it is one heavy SOB. They loved iron back then. I could budge the tail stock end manually, but not the gear end. Also, I had to get it out by 5PM. By the time I got back to my office to get a stakebed and some tools, and back to the school (30 min. drive each way) it was 4PM. The guys in charge were school system employees, so you can bet there was no assistance available and they would be locking the doors at 4:50.
At home, I quickly removed my machine mover from the mill in my shop. This involved putting it up on temporary blocks. Sounds easy? Not. I had to plane some oak cribbing to the exact thickness of the gap between the rails of the mover and the slab, then wedge them in and unbolt the mover and pull out the rails (see earlier post for pictures). I grabbed some wood cribbing and a spud bar, and was off to the school. The lift gate on my stakebed--a gift from God himself--is good for 1,750 lbs. It barely worked for the mill, but the lathe looked to be a lot less heavy.
Back at the school with the clock running, I worked frantically and got my wheel rails lined up and the cross rails in place to bolt together under the lathe once I got it up on blocks. The details of this effort are hard to describe. I used the spud bar as a lever and the wood cribbing for both a fulcrum and to block the corners up a little at a time, being careful to not interfere with placement of the rails which would have to slide in around the base. Suffice to say that I was able to get this thing out the door as they were turning the key in the locks behind me. Fortunately it was a beautiful day and breezy, so my sweat drenched clothes dried out a bit on the drive home. I sat down to dinner at 6:30 with the family, the lathe in my garage and the stakebed parked back at the office.
I work alone quite a bit, and one learns tricks and techniques along the way. Most importantly, never forget your good friend Archi Medes. Good old Archi will lift you up and only let you down easy.
Obviously, it has a 3 phase motor. But since I am already using a variable frequency drive on my 3 phase vertical mill, I'm thinking I will be able to run the lathe off the same drive and not have to buy another one. I just wont be able to run them simultaneously. I'll probably wire in a disconnect so that its not possible to accidently have them both in the "on" position at the same time.
Moving this dude presented the same problems as with the Mill; it is one heavy SOB. They loved iron back then. I could budge the tail stock end manually, but not the gear end. Also, I had to get it out by 5PM. By the time I got back to my office to get a stakebed and some tools, and back to the school (30 min. drive each way) it was 4PM. The guys in charge were school system employees, so you can bet there was no assistance available and they would be locking the doors at 4:50.
At home, I quickly removed my machine mover from the mill in my shop. This involved putting it up on temporary blocks. Sounds easy? Not. I had to plane some oak cribbing to the exact thickness of the gap between the rails of the mover and the slab, then wedge them in and unbolt the mover and pull out the rails (see earlier post for pictures). I grabbed some wood cribbing and a spud bar, and was off to the school. The lift gate on my stakebed--a gift from God himself--is good for 1,750 lbs. It barely worked for the mill, but the lathe looked to be a lot less heavy.
Back at the school with the clock running, I worked frantically and got my wheel rails lined up and the cross rails in place to bolt together under the lathe once I got it up on blocks. The details of this effort are hard to describe. I used the spud bar as a lever and the wood cribbing for both a fulcrum and to block the corners up a little at a time, being careful to not interfere with placement of the rails which would have to slide in around the base. Suffice to say that I was able to get this thing out the door as they were turning the key in the locks behind me. Fortunately it was a beautiful day and breezy, so my sweat drenched clothes dried out a bit on the drive home. I sat down to dinner at 6:30 with the family, the lathe in my garage and the stakebed parked back at the office.
I work alone quite a bit, and one learns tricks and techniques along the way. Most importantly, never forget your good friend Archi Medes. Good old Archi will lift you up and only let you down easy.
Monday, April 26, 2010
Yoda
I finally got around to taking a closer look at the Alvarez guitar my friend gave me to take a "crack" at repairing. Several weeks ago, I began to disassemble what was left to disassemble. I took off the strings, which were the only thing holding the neck and body together. I tried to compare the low E to a piece of field fence I dug up out of the back yard, but without a microscope I couldn't make any claims for certain. The neck was broken off the body through the heel, so I planned to remove the rest of the heel from the dovetail and glue it back together. I stripped the hardware off the neck to clean it up. I used mineral spirits to try to get years of grime off the fretboard--this thing has been sitting in a garage for a long time. I ended up taking a chisel to the fretboard to scrape across the grain against each fret. This was not a great idea and yielded poor results.
So this weekend, I decided I would re-fret the thing, since the top three frets were badly grooved. The fret board itself is also worn in the top three frets--from long fingernails I guess. So I removed all of the frets and sanded the entire neck to original wood--it looks much better already. I removed the fake wood headstock cover--it was very disappointing--actual paper printed with fake wood grain and the logo--no inlay at all. I'll make a new real wood cover. I removed the plastic binding and the plastic nut so I can profile the neck properly. I thought about sanding the grooves out, but that would take too much material off. I could just replace the fretboard at this point, but I think I want to keep as much of the original parts as possible; and, not tie too much money into this thing. I will fill the divots with epoxy filler, which should blend well enough. I plan to replace the nut with bone, just for fun. I'll make it from a piece of cow bone--I think I may have a chew toy laying around somewhere from my dear old departed canine. It should machine like wood.
I removed the neck heel from the dovetail by heating it with a heat gun and using a bar clamp to "press" it out of the joint. This was a bit tenuous as it involved a lot of heat and pressure, both of which threatened to reduce the parts of this instrument to ash and splinters. Ultimately, it popped out nicely and I learned that removing a dovetail neck is not too big a deal. I glued the heel back together with the neck and I expect the neck will go back together with the body with minimal trouble.
Now for the major damage. The cracked back looked like I may be able to press the crack back together and glue it up. I made a clamping block and got most of the crack to fit back together, but I just wasn't satisfied that this was going to be adequate. I decided to replace the entire back. It came apart with a fair amount of effort and patience. Unbelievably, of all the tooling at my disposal, a cheap pocket knife worked the best. Although the binding will have to be replaced as well, as it melted from the heat gun and was severely damage by the pocket knife, the sides are very serviceable and I expect no trouble mating a new back and re-binding. I would like to make new wood binding, but since I am not re-binding the entire guitar, I will have to match the existing white plastic on the front. There is real danger of making a silk purse from a sow's ear.
So now I have the thing disassembled and ready for new parts and re-finishing and re-assembly. This week I will acquire the new fret wire and decide if I'm going to buy blanks for the back or make the back from lumber I have laying around. I am trying to keep the front completely untouched. It is the essence of "character" and if it were mine, I would want it untouched. I will clean it up a little, because I simply can't stand the grime. The pickup should be easy to fix--it just needs to be cleaned and re-soldered to a new PL55 jack.
I'm looking forward to finishing this thing. I'm particularly interested in seeing how the glue holds up on the neck.
So this weekend, I decided I would re-fret the thing, since the top three frets were badly grooved. The fret board itself is also worn in the top three frets--from long fingernails I guess. So I removed all of the frets and sanded the entire neck to original wood--it looks much better already. I removed the fake wood headstock cover--it was very disappointing--actual paper printed with fake wood grain and the logo--no inlay at all. I'll make a new real wood cover. I removed the plastic binding and the plastic nut so I can profile the neck properly. I thought about sanding the grooves out, but that would take too much material off. I could just replace the fretboard at this point, but I think I want to keep as much of the original parts as possible; and, not tie too much money into this thing. I will fill the divots with epoxy filler, which should blend well enough. I plan to replace the nut with bone, just for fun. I'll make it from a piece of cow bone--I think I may have a chew toy laying around somewhere from my dear old departed canine. It should machine like wood.
I removed the neck heel from the dovetail by heating it with a heat gun and using a bar clamp to "press" it out of the joint. This was a bit tenuous as it involved a lot of heat and pressure, both of which threatened to reduce the parts of this instrument to ash and splinters. Ultimately, it popped out nicely and I learned that removing a dovetail neck is not too big a deal. I glued the heel back together with the neck and I expect the neck will go back together with the body with minimal trouble.Now for the major damage. The cracked back looked like I may be able to press the crack back together and glue it up. I made a clamping block and got most of the crack to fit back together, but I just wasn't satisfied that this was going to be adequate. I decided to replace the entire back. It came apart with a fair amount of effort and patience. Unbelievably, of all the tooling at my disposal, a cheap pocket knife worked the best. Although the binding will have to be replaced as well, as it melted from the heat gun and was severely damage by the pocket knife, the sides are very serviceable and I expect no trouble mating a new back and re-binding. I would like to make new wood binding, but since I am not re-binding the entire guitar, I will have to match the existing white plastic on the front. There is real danger of making a silk purse from a sow's ear.
So now I have the thing disassembled and ready for new parts and re-finishing and re-assembly. This week I will acquire the new fret wire and decide if I'm going to buy blanks for the back or make the back from lumber I have laying around. I am trying to keep the front completely untouched. It is the essence of "character" and if it were mine, I would want it untouched. I will clean it up a little, because I simply can't stand the grime. The pickup should be easy to fix--it just needs to be cleaned and re-soldered to a new PL55 jack.
I'm looking forward to finishing this thing. I'm particularly interested in seeing how the glue holds up on the neck.
Sunday, February 21, 2010
Guitar Gyro
A friend of mine played for years on the local rock band circuit. At some point in a performance to which I was not witness, he apparently channeled Pete Townsend and the result was that his well worn Alvarez guitar received new ventilation in its back. I had briefly seen the guitar before the incident and, for some reason, I recalled that this was a "Yairi" model, meaning that it was a high-end instrument, hand-made in a sequestered village shop in the mountains of Japan. Yes--a Japanese Master named Yairi in a small village workshop--the stuff of movies.
Although the band since disbanded, I had recently heard that my friend was thinking of returning to the scene (music scene, not crime scene), and it made me think of the ill-fated instrument. Not having seen it since its brush with death, I did not know the extent of the damage. But I figured that rather than let it languish in his garage and eventually get thrown away, it might be worth a try for me to at least dissect it and learn a little about lutherie, with the possible outcome of resurrecting the instrument. After all, if it was a Yairi, the woods alone were undoubtedly worth trying to salvage.
Well, I got my hands on the poor thing yesterday. Clearly, my friend had not been playing Guitar Gyro, but Guitar Grinder. I did not expect to receive it in two pieces, one of which has a nice rattle when you shake it. This should be quite a challenge.
Since I made no promises regarding actual success in repairing this thing, or a time-line, I'm under no pressure. And, it turns out, to the best of my internet research enhanced knowledge, it is not a Yairi. But I must admit that I am nonetheless both excited to get started, and baffled as to where to begin. This should be fun.
Although the band since disbanded, I had recently heard that my friend was thinking of returning to the scene (music scene, not crime scene), and it made me think of the ill-fated instrument. Not having seen it since its brush with death, I did not know the extent of the damage. But I figured that rather than let it languish in his garage and eventually get thrown away, it might be worth a try for me to at least dissect it and learn a little about lutherie, with the possible outcome of resurrecting the instrument. After all, if it was a Yairi, the woods alone were undoubtedly worth trying to salvage.
Well, I got my hands on the poor thing yesterday. Clearly, my friend had not been playing Guitar Gyro, but Guitar Grinder. I did not expect to receive it in two pieces, one of which has a nice rattle when you shake it. This should be quite a challenge.
Since I made no promises regarding actual success in repairing this thing, or a time-line, I'm under no pressure. And, it turns out, to the best of my internet research enhanced knowledge, it is not a Yairi. But I must admit that I am nonetheless both excited to get started, and baffled as to where to begin. This should be fun.
Saturday, February 20, 2010
Furnace Fun
Had a furnace issue recently. It makes perfect sense, of course, because this particular furnace is nearly four years old and has only given me trouble once before. I was due.
The house has two furnaces: one for the basement and main level and one for the upstairs. This is good because apparently furnaces are like Jaguars: you need two so you always have an operable one while the other is being repaired. These are high efficiency furnaces, which necessitates a power vent--the Achilles heel of furnacedom. Because these units are so efficient, they combust the natural gas more completely and also extract more heat from the exhaust gas, so, without getting too technical, the result is liquid water in the flue pipe. This water drains back down the pipe, by design, through the draft inducer blower housing and down into the floor drain, after passing through a number of hoses and plastic fittings. Therein lies the problem.
As a safety feature, there are magic switches that know when everything is not ducky in the furnace and shut things down. These switches are so magically endowed as to sense even the slightest little problem. In other words, they are as moody as a teenage girl. If the condensed vapor (liquid water) does not completely drain out of the inducer blower housing, the inducer fan blades pass through the water, consequently slowing their speed, causing the blower to draw more power in order to keep up. The magical sensors see that the blower wants more power and throw a hissy fit, shutting everything down. You wake up cold.
The fix is simple; you just have to clean out the fittings and hoses. What, you may ask, could be clogging them up? I have it from an actual trained technician that the offending matter is dead bugs. Having cleaned out black gunk from the hose fittings, I can neither confirm nor deny this. The matter is simply unrecognizable to the naked eye in this form. I will say, though, that it is tenacious. I had cleaned out the fittings and hoses only days ago, leading me to think that a beast of a different stripe was afoot this time.
Observing that the furnace was igniting and burning for a period of time, then exhibiting flame quality issues and ultimately limiting out, I was gunning for the gas valve. Logical, right? I mean, I just cleared the drain lines. And besides, if the inducer housing was full of water, the furnace should never ignite at all, right? I consulted an expert. At first, he agreed that the gas valve was the culprit. But on further discussion, he suggested that it might be that the sensor in the inducer housing was PMSing--flipping open and shut, overly sensitive to the realities of everyday blowing conditions. In my world, this kind of erratic, unpredictably humanistic behavior from inanimate objects is perfectly normal.
Preparing to do internet-galactic battle with online appliance parts vendors, I donned my minor's cap and delved deep into the bowels of the furnace in search of the "Secret Magic Talisman" that would ensure victory. This "Talisman" is protected by various traps and camouflage designed to obfuscate it's secret location to even the most stalwart homeowner. I had inoculated myself against treacherous conditions by imbibing an ancient elixir of hops and barley. Emerging unscathed, I heard a muffled cry from my favorite red flannel shirt, mortally wounded...brave soul. The red shirt always gets it. No time to mourn--I started for the computer with my prize: the serial number.
But something clicked in my head. It wasn't a blood vessel. This time. Like Obi Wan, a voice came to me: "Abuse the furnace". So I kicked it. But there was more. A lifetime of implausible circumstances flashed before my eyes with an accompanying score by John Williams: new replacement parts bad from the factory, dropped screws lost in pants cuffs, pinhole leaks in new copper plumbing, beads of solder that looked just like dropped ball bearings, bad ground connections--lots of bad ground connections; the images taunted me. But the message was clear--do not rule out the absurd. Yoda chided me: "Do or do not; there is no try". I bitch-slapped that little Muppet.
But I could not deny that, as often as not, the problem lies in a previously ruled out scenario. So I checked the hoses and fittings again. This time, I took a critical elbow fitting completely out of the furnace and down to the shop. Blowing through the fitting produced an air stream out the other side, but it was a little weak. So I fired up the air compressor and decided to put 120psi through that little orifice. Sure enough, what must have been the mangled body of a very crusty bug shot out the small end of the fitting and pinged a piece of sheet metal leaned up against a wall. "Inconceivable!", I said out loud. And that was it. After all that, the problem was that I had done a half-assed job of cleaning out the dead bugs in the drain line.

It occurs to me often that when something as common and predictable as a bug can stop the furnaces of the world, that perhaps the engineers are a little arrogant when they decide on tolerances. I mean, what is the point of making a drain line orifice so small that a dead bug can clog it, especially when the clog results in a failure of the entire system? Just asking.
The house has two furnaces: one for the basement and main level and one for the upstairs. This is good because apparently furnaces are like Jaguars: you need two so you always have an operable one while the other is being repaired. These are high efficiency furnaces, which necessitates a power vent--the Achilles heel of furnacedom. Because these units are so efficient, they combust the natural gas more completely and also extract more heat from the exhaust gas, so, without getting too technical, the result is liquid water in the flue pipe. This water drains back down the pipe, by design, through the draft inducer blower housing and down into the floor drain, after passing through a number of hoses and plastic fittings. Therein lies the problem.
As a safety feature, there are magic switches that know when everything is not ducky in the furnace and shut things down. These switches are so magically endowed as to sense even the slightest little problem. In other words, they are as moody as a teenage girl. If the condensed vapor (liquid water) does not completely drain out of the inducer blower housing, the inducer fan blades pass through the water, consequently slowing their speed, causing the blower to draw more power in order to keep up. The magical sensors see that the blower wants more power and throw a hissy fit, shutting everything down. You wake up cold.
The fix is simple; you just have to clean out the fittings and hoses. What, you may ask, could be clogging them up? I have it from an actual trained technician that the offending matter is dead bugs. Having cleaned out black gunk from the hose fittings, I can neither confirm nor deny this. The matter is simply unrecognizable to the naked eye in this form. I will say, though, that it is tenacious. I had cleaned out the fittings and hoses only days ago, leading me to think that a beast of a different stripe was afoot this time.
Observing that the furnace was igniting and burning for a period of time, then exhibiting flame quality issues and ultimately limiting out, I was gunning for the gas valve. Logical, right? I mean, I just cleared the drain lines. And besides, if the inducer housing was full of water, the furnace should never ignite at all, right? I consulted an expert. At first, he agreed that the gas valve was the culprit. But on further discussion, he suggested that it might be that the sensor in the inducer housing was PMSing--flipping open and shut, overly sensitive to the realities of everyday blowing conditions. In my world, this kind of erratic, unpredictably humanistic behavior from inanimate objects is perfectly normal.
Preparing to do internet-galactic battle with online appliance parts vendors, I donned my minor's cap and delved deep into the bowels of the furnace in search of the "Secret Magic Talisman" that would ensure victory. This "Talisman" is protected by various traps and camouflage designed to obfuscate it's secret location to even the most stalwart homeowner. I had inoculated myself against treacherous conditions by imbibing an ancient elixir of hops and barley. Emerging unscathed, I heard a muffled cry from my favorite red flannel shirt, mortally wounded...brave soul. The red shirt always gets it. No time to mourn--I started for the computer with my prize: the serial number.
But something clicked in my head. It wasn't a blood vessel. This time. Like Obi Wan, a voice came to me: "Abuse the furnace". So I kicked it. But there was more. A lifetime of implausible circumstances flashed before my eyes with an accompanying score by John Williams: new replacement parts bad from the factory, dropped screws lost in pants cuffs, pinhole leaks in new copper plumbing, beads of solder that looked just like dropped ball bearings, bad ground connections--lots of bad ground connections; the images taunted me. But the message was clear--do not rule out the absurd. Yoda chided me: "Do or do not; there is no try". I bitch-slapped that little Muppet.
But I could not deny that, as often as not, the problem lies in a previously ruled out scenario. So I checked the hoses and fittings again. This time, I took a critical elbow fitting completely out of the furnace and down to the shop. Blowing through the fitting produced an air stream out the other side, but it was a little weak. So I fired up the air compressor and decided to put 120psi through that little orifice. Sure enough, what must have been the mangled body of a very crusty bug shot out the small end of the fitting and pinged a piece of sheet metal leaned up against a wall. "Inconceivable!", I said out loud. And that was it. After all that, the problem was that I had done a half-assed job of cleaning out the dead bugs in the drain line.

It occurs to me often that when something as common and predictable as a bug can stop the furnaces of the world, that perhaps the engineers are a little arrogant when they decide on tolerances. I mean, what is the point of making a drain line orifice so small that a dead bug can clog it, especially when the clog results in a failure of the entire system? Just asking.
Monday, February 15, 2010
The Mill
Having referenced the "mill" a few times, I thought I would post a picture and short explanation of how this tool came to me.
As you can see in the picture, it is your standard issue vertical mill, or "Bridgeport" as they are commonly known by the dominant manufacturer (like Kleenex). Honestly, until recently, I was only vaguely aware of what this type of machine could do, since I have no machining background except in having built many buildings and additions for tooling shops over the years. However, my father spent decades in a research environment that afforded him many opportunities to teach himself some basic machining skills and, now retired, often laments his loss of access to milling and other machining equipment. Additionally, my brother is also self-taught in basic machining work, being an engineer and also working for years in that environment. As for me, my experience was limited to machines for wood.
I really had no desire to acquire a mill; I knew little of how to use one and therefore couldn't really see what I would do with it. And, in my home garage-shop, like most, space is at a premium. I knew enough about mills to know that they are heavy and bulky and if I had one in my shop, it would be set once and never moved again. Since I am always moving equipment around (you'll recall that I mount everything on casters), the thought of an iron behemoth looming over me and collecting dust (a lot of dust) wasn't too appealing. Still, Dad occasionally pointed out to me how various routing functions I was performing, or he was doing in his home shop, would have been so much easier with a mill.
I mentioned this to my brother one day and he told me that he had several mills at his business facility that were in long term storage [read: sitting in the parking lot under tarps], and likely to never be used again, as the technology is pretty outdated these days. I mentioned that I would like to acquire one, thinking that the logistics would make it improbable, but feeling like I had at least addressed the possibility.
A turn of events changed a lot of things for my brother and it seemed that, as Luck was shitting on him, she was shining on me. For in a shifting, swirling tide of excrement, a mill managed to bob to the surface and find its way across many miles to my construction yard. I had no idea of how handy this would be.
Well, the mill lived in my warehouse for a good while, because I had no room for it at home and no idea how I was going to move it. The thought of renting a forklift was just unappealing--spending any money at all was unappealing. So there it sat, all summer, under a blue tarp on a wood skid. At the time, the warehouse was full of other junk, so it was in the way, but not alone. But I knew I couldn't let it languish in limbo forever, so I finally made up my mind to move it to my shop one day. By myself.
I still don' really know what this thing weighs. Guesses had ranged from a "lot" to a "whole lot". Ultimately, I figured it weighed right around 1700 pounds, because that is the capacity of the lift gate on my stake bed truck, which seemed to be at maximum capacity when I tried to lift the mill about 2' off the loading dock. I don't think that the lift would have made it from the ground all the way up, about 4'.
In order to move the mill from the warehouse to the truck, then from the truck to its place in my shop, I had to come up with a dolly with +/-1700 pound capacity. This exceeds most dollies' limits. And, I had to lift the mill up onto the dolly, then back off again. By myself. I'm guessing that Archimedes never tried to move a 1700 pound mill. The solution came in the form of four pieces of angle iron and four 3000 pound capacity steel wheels I found at the surplus store. I simply used four grade five bolts as axles, two on each end of an angle. The remaining two pieces of angle would be bolted across the two pieces with the wheels, to form a dolly that I sized to fit the base of the mill exactly. The wheels were of the appropriate diameter as to allow me to cut the wood skid out from under the mill with a sawzall while shoring it up with blocking and bolt the dolly around the base. Having carefully sized the blocking, I was able to nudge the whole thing off the final block and onto the ground, dolly attached, with a spud bar.
I then rolled the mill right onto the the dock and onto the lift gate. At this point, the biggest challenge was in not letting this thing get away from me. Mass in motion and all that. As I engaged the lift, it didn't move at first, but the rear end of the truck groaned as it squatted about a foot. Eventually, the lift gate and the truck bed met in the middle, and I rolled the thing up onto the bed and over the axles and strapped it down. Not wanting to know what effect this mill would have on traffic, I went ahead and strapped it down with actual rigging. If this thing got to rolling on the bed of the truck, I imagined it would roll right through the stakes and squash a car like a soda can.
The drive to my house was easy. Once again, building my house near the office paid off in simple back roads and low speed. In my younger days, the trip would have been about a pucker factor 5, because I would have been driving too fast. At my current rate of wisdom acquisition, I suspect that I will be one of those old men poking along at 25 MPH in every situation. Hard to believe how reckless I have been, looking back.
So, I backed up to my garage door, unstrapped the mill and rolled it onto the lift gate. All this "simply rolling" may lead one to think I wasn't working too hard. Imagine pushing something as hard as you can to get it moving, then stopping it before it rolls two inches. About ten times. I took solace in the fact that if the mill fell off the edge of the lift gate, I'm fairly experienced with concrete work. What's the worst thing that can happen? Crater. I stood on the lift gate, steadying the mill with one hand (silly, I know) and grasped the control lever with the other. I engaged the lever to "lower", and we went down like Wile Coyote. The lift gate apparently had enough surface area to spread the load onto my driveway adequately so that it only gouged the concrete instead of cracking it.
I rolled the mill into position in its new home and there it sits still. I can easily move it if I want to, because the custom made dolly is pretty much permanent. It fits nicely in its little corner with enough clearance for the bed to move in all directions unimpeded. Now all I had to do was figure out how to power it, since, of course, it has a 3 phase motor.
I really had no desire to acquire a mill; I knew little of how to use one and therefore couldn't really see what I would do with it. And, in my home garage-shop, like most, space is at a premium. I knew enough about mills to know that they are heavy and bulky and if I had one in my shop, it would be set once and never moved again. Since I am always moving equipment around (you'll recall that I mount everything on casters), the thought of an iron behemoth looming over me and collecting dust (a lot of dust) wasn't too appealing. Still, Dad occasionally pointed out to me how various routing functions I was performing, or he was doing in his home shop, would have been so much easier with a mill.
I mentioned this to my brother one day and he told me that he had several mills at his business facility that were in long term storage [read: sitting in the parking lot under tarps], and likely to never be used again, as the technology is pretty outdated these days. I mentioned that I would like to acquire one, thinking that the logistics would make it improbable, but feeling like I had at least addressed the possibility.
A turn of events changed a lot of things for my brother and it seemed that, as Luck was shitting on him, she was shining on me. For in a shifting, swirling tide of excrement, a mill managed to bob to the surface and find its way across many miles to my construction yard. I had no idea of how handy this would be.
Well, the mill lived in my warehouse for a good while, because I had no room for it at home and no idea how I was going to move it. The thought of renting a forklift was just unappealing--spending any money at all was unappealing. So there it sat, all summer, under a blue tarp on a wood skid. At the time, the warehouse was full of other junk, so it was in the way, but not alone. But I knew I couldn't let it languish in limbo forever, so I finally made up my mind to move it to my shop one day. By myself.
I still don' really know what this thing weighs. Guesses had ranged from a "lot" to a "whole lot". Ultimately, I figured it weighed right around 1700 pounds, because that is the capacity of the lift gate on my stake bed truck, which seemed to be at maximum capacity when I tried to lift the mill about 2' off the loading dock. I don't think that the lift would have made it from the ground all the way up, about 4'.
In order to move the mill from the warehouse to the truck, then from the truck to its place in my shop, I had to come up with a dolly with +/-1700 pound capacity. This exceeds most dollies' limits. And, I had to lift the mill up onto the dolly, then back off again. By myself. I'm guessing that Archimedes never tried to move a 1700 pound mill. The solution came in the form of four pieces of angle iron and four 3000 pound capacity steel wheels I found at the surplus store. I simply used four grade five bolts as axles, two on each end of an angle. The remaining two pieces of angle would be bolted across the two pieces with the wheels, to form a dolly that I sized to fit the base of the mill exactly. The wheels were of the appropriate diameter as to allow me to cut the wood skid out from under the mill with a sawzall while shoring it up with blocking and bolt the dolly around the base. Having carefully sized the blocking, I was able to nudge the whole thing off the final block and onto the ground, dolly attached, with a spud bar.I then rolled the mill right onto the the dock and onto the lift gate. At this point, the biggest challenge was in not letting this thing get away from me. Mass in motion and all that. As I engaged the lift, it didn't move at first, but the rear end of the truck groaned as it squatted about a foot. Eventually, the lift gate and the truck bed met in the middle, and I rolled the thing up onto the bed and over the axles and strapped it down. Not wanting to know what effect this mill would have on traffic, I went ahead and strapped it down with actual rigging. If this thing got to rolling on the bed of the truck, I imagined it would roll right through the stakes and squash a car like a soda can.
The drive to my house was easy. Once again, building my house near the office paid off in simple back roads and low speed. In my younger days, the trip would have been about a pucker factor 5, because I would have been driving too fast. At my current rate of wisdom acquisition, I suspect that I will be one of those old men poking along at 25 MPH in every situation. Hard to believe how reckless I have been, looking back.
So, I backed up to my garage door, unstrapped the mill and rolled it onto the lift gate. All this "simply rolling" may lead one to think I wasn't working too hard. Imagine pushing something as hard as you can to get it moving, then stopping it before it rolls two inches. About ten times. I took solace in the fact that if the mill fell off the edge of the lift gate, I'm fairly experienced with concrete work. What's the worst thing that can happen? Crater. I stood on the lift gate, steadying the mill with one hand (silly, I know) and grasped the control lever with the other. I engaged the lever to "lower", and we went down like Wile Coyote. The lift gate apparently had enough surface area to spread the load onto my driveway adequately so that it only gouged the concrete instead of cracking it.
I rolled the mill into position in its new home and there it sits still. I can easily move it if I want to, because the custom made dolly is pretty much permanent. It fits nicely in its little corner with enough clearance for the bed to move in all directions unimpeded. Now all I had to do was figure out how to power it, since, of course, it has a 3 phase motor.
Sunday, February 14, 2010
That's Snow Fun
Since the last few posts have been about the white menace, I thought I should make something fun to balance things out. My good friend called me Friday and invited me to his place to go sledding with the kids Saturday. I thought this was a great idea and was looking forward to it. Unfortunately, my wife had already made plans with the kids so I had to beg off at the last minute. But the idea stuck.
So I spent Saturday afternoon building a sled. I had an old pair of skis from my high school days that had managed to dodge several dumpster rampages over the last 25 years. I have actually used them as recently as a few years ago, but mostly they have occupied various corners of various basements, garages, and closets the better part of the quarter century. I even attempted to sell them in a garage sale and they failed to bring the $15 I was asking. Remembering what I paid for them-- in hard earned high school cash in a pre-China-dominated economy--I think I would rather throw them away than sell them for $15 anyway.
I wanted to make a sled using the skis for runners. And even though I was willing to throw them away, or sell them for $15, I did not want to damage them in the conversion. So I machined two pieces of maple (leftover cabinet parts) to fit into the bindings exactly. The mill was very handy for this. I used maple because it is very strong and not grainy, so I figured it would not split as easily as oak. I made two cross struts from some Douglas fir leftover from the porch columns that I had shipped in from California when I built the house. I re-sawed the fir into two 2" thick pieces and cut an arch shape on the band saw, just to take a little weight off and add a little to the look. I machined two 1-1/4" deep dadoes into the struts with the mill to receive oak frames. The oak was leftover from a recent church addition and was already stained. I sanded the stain off with my handy-dandy Telex sander--worked like a charm. I was a little concerned with the red oak splitting under stress, which is why I machined the dadoes so deep--to get extra glue surface area. The top is made of cedar leftover from the gate of a dumpster enclosure at a medical office building. Everything is glued with only a few nails to hold the top while the glue set. The whole shebang clamps into the bindings as one unit, so the skis are still usable for their intended purpose, or if I ever need $15.
The kids and I spent Sunday afternoon at the local sledding hill and had a blast. All three of us can fit handily on the deck and it zips right along. I also found that it makes pulling two children up the hill reasonably doable. Good fun.
So I spent Saturday afternoon building a sled. I had an old pair of skis from my high school days that had managed to dodge several dumpster rampages over the last 25 years. I have actually used them as recently as a few years ago, but mostly they have occupied various corners of various basements, garages, and closets the better part of the quarter century. I even attempted to sell them in a garage sale and they failed to bring the $15 I was asking. Remembering what I paid for them-- in hard earned high school cash in a pre-China-dominated economy--I think I would rather throw them away than sell them for $15 anyway.
Subscribe to:
Posts (Atom)






